Saturday, July 1, 2017

Steps Employed In The Installation Of Substation Packager

By Richard Stewart


The installation of an electrical system is determined by the usefulness of network that will be connected. The plan of constructing a substation packager is determined by the total power required and the availability of electricity needed during installation. During the construction, the utility, construction of a substation is by its specification. Moreover, the owner of an electrical installation constructs and ensures that the plant is fully equipped. The steps followed during the construction are as follows.

All the required information should be provided to ensure that the project is approved accordingly. The details that are provided give the engineers the overview of how the power will be distributed and if it will meet the power needed in future life. It is important also to determine the location and the security of a station to ensure that it will be free from any form of destruction.

For the approval of any construction to take place in any public area, some inspections are done to ensure that it meets the required demands. The area is tested to ensure that the earth electrode resistance is appropriate. Further, perfective rays checking, both equi-potential electrical continuity and bonding conductors have to be well approved to make sure the site is worth the salt. Remember that testing of mechanical and electrical interlocks is essential.

The area selected is prepared by first clearing the site, all vegetation cover is cleared to make sure the unwanted material is removed. Obstacles such as the stones, stumps are taken from the site. Leveling of the area is done by placing aggregates and sand on the floor to be sure that the required surface is attained. Plunge pools and ponds are created as expected.

Foundation is laid after the site is well prepared. To ensure the ground work is done as expected, well-made concrete is put deep down around six inches below. It is important to know that the level at which the foundation is installed depends on the size and the weight of machines used. Experts in this field should work hand in hand to come up with the best foundation to hold the weight of a power station.

Equipment that is used in the substation ought to be delivered and handled with care to avoid interfering with their conformation. The equipment installed includes the circuit breaker, transformers, capacitor banks, and the steel structures. After the construction is done, six inches of crushed stones are placed over the station. At this level, the site has a finished appearance.

Final restoration of the site is done by the contractor. It comprises of getting rid of the non-permanent environmental controls and installation of vegetation buffers. The station can start functioning immediately after the installation process is done. Electricians, who are well equipped, should be always available in the site in case a problem arises.

Ample period need to be given to the people working at the station to ensure all work is done appropriately without applying the try and error method. It is important to know that well-selected materials will improve the efficiency of substation. Further, security should be highly maintained.




About the Author:



No comments:

Post a Comment